درس تعليمي: التحليل المكاني باستخدام جبر الخرائط
8. Report the results
Now we have identified the accessible and inaccessible wells we need to prepare the result map for reporting to the contractor.
In the next steps, we are going to:
- Convert raster cells of the wells to point vectors for a better visualisation
- Sample raster values to add attributes from the calculated layers
- Style the analysis results