5. Compute Indicators Using Indicators Calculator Tab

5.5. Total Biomass Production (TBP)

Now we'll calculate the Total Biomass Production.

1. In the Indicator Selection dropdown, select Total Biomass Production.

Formula
TBP = (NPP * 22.222) / 1000
This converts Net Primary Production (NPP) from gC/m² to biomass production in ton/ha.

2.
 In the Formula Parameters, select the seasonal NPP raster (WH_L3_NPP_S_2022_10_01).

3. Name the output file as WH_TBP_2022_10_01.

4. Click Calculate Indicator. The output will be saved in the Waplugin_workshop folder and displayed as a raster.