5. Compute Indicators Using Indicators Calculator Tab
5.5. Total Biomass Production (TBP)
Now we'll calculate the Total Biomass Production.
1. In the Indicator Selection dropdown, select Total Biomass Production. Formula: TBP = (NPP * 22.222) / 1000 This converts Net Primary Production (NPP) from gC/m² to biomass production in ton/ha. 2.In the Formula Parameters, select the seasonal NPP raster (WH_L3_NPP_S_2022_10_01).
3. Name the output file as WH_TBP_2022_10_01.
4. Click Calculate Indicator. The output will be saved in the Waplugin_workshop folder and displayed as a raster.