loader image
छोड़ कर मुख्य सामग्री पर जाएं
Completion requirements

5. Compute Indicators Using Indicators Calculator Tab

5.6. Biomass Water Productivity (WPb)

The next indicator is the Biomass Water Productivity.

1. In the Indicator Selection dropdown, select Biomass Water Productivity.

Formula
WPb = (TBP / AETI) * 100This measures the amount of biomass produced per unit of water consumed.

2. In the Formula Parameters, select the Total Biomass
Production raster
 (WH_TBP_2022_10_01) and the seasonal AETI raster.

3. Name the output file as WH_WPb_2022_10_01.

4. Click Calculate Indicator. The output raster will be saved and loaded into QGIS.